Technical specifications and operation points for 110kV transformer insulating oil filtration
1. Oil quality testing:
- Test items: moisture content (≤15ppm), breakdown voltage (≥50kV), dielectric loss factor (90℃≤0.02)
- Sampling specifications: According to the requirements of GB/T 7597, take a 500mL of oil sample for full analysis
2. Equipment selection:
- It is recommended to use a two-stage vacuum oil filter
- Technical parameter requirements:
Vacuum degree ≤5Pa (first-level vacuum chamber)
Heating temperature 60±5℃
Filtration accuracy ≤3μm
3. On-site preparation:
- Build a dustproof shed (humidity ≤60%)
- Prepare enough spare oil (20% of the processing volume)
1. Pretreatment stage:
- Coarse filtration: first remove large particles through a 20μm filter element
- Sedimentation separation: let it stand for 48 hours to discharge free water
2. Main treatment stage:
- Vacuum dehydration:
Temperature of first-level vacuum chamber 50-55℃
Temperature of second-level vacuum chamber 60-65℃
Cycle period ≥5 times
- Precision filtration:
Use a 3μm filter element with β≥200
Pressure difference controlled at 0.15-0.25MPa
3. Post-treatment stage:
- Vacuum oil injection: Keep vacuum degree ≤13Pa
- Standing time: ≥72 hours
| Project | Control standard | Detection frequency |
|--------------|-------------------------|----------|
| Vacuum degree | ≤5Pa (first level) | Real-time monitoring |
| Oil temperature | 60±5℃ | Every hour |
| Water content | ≤10ppm | Every 2 hours |
| Breakdown voltage | ≥60kV | Every 4 hours |
| Gas content | ≤0.5% | Every 8 hours |
1. Safety control:
- Electrostatic grounding resistance of oil pipeline ≤4Ω
- Set combustible gas alarm (alarm value ≤ 10% LEL)
2. Quality assurance measures:
- The amount of oil processed in each batch does not exceed 10 tons
- Establish oil processing curve (water content-time curve)
- The final oil sample is sent to a third party for testing
3. Special treatment:
- For oil products with acid value > 0.05mgKOH/g:
Add white clay adsorption treatment
Extend the cycle time to 8-10 times
1. Electrical performance:
- Breakdown voltage ≥60kV (DL/T 429.9)
- Dielectric loss factor ≤0.005 (90℃)
2. Physical and chemical indicators:
- Water content ≤8ppm
- Gas content ≤0.3%
- Particle size ≤NAS level 8
3. Compatibility test:
- Contact with solid insulating material for 72 hours without abnormality
1. The vacuum degree does not meet the standard:
- Check the oil level of the mechanical pump
- Check the sealing of the vacuum valve
- Check the connection of the bellows
2. Abnormal oil temperature:
- Clean the carbide on the surface of the heater
- Calibrate the PT100 temperature sensor
3. Low filtration efficiency:
- Check the saturation of the filter element
- Adjust the oil pump speed to the rated value
Note: The operation process must strictly follow the requirements of the "Preventive Test Procedures for Power Equipment" (DL/T 596), record key parameters throughout the process, and keep the treated oil sample for reference for 3 months. It is recommended to operate under the guidance of professional technicians, and contact the equipment manufacturer for technical support in complex situations.